Division of Quality Assurance NFPA 110 Interpretations Emergency Power System - 1999 Edition

The following clarifications resolve areas of concern raised by facility owners, designers, or contractors that have commonly occurred during the planning, construction, or inspection of a health care facility.

Number

Subject

NFPA 110-1
(PDF, 53 KB)

Generator Remote Stop Location

Last Revised: October 20, 2014